|
|
Brewery Bottling Line Project OverviewThe project consisted of installing a new 1200 bottle per minute line from the de-palletizer to the final casers. Dahlen Systems, Inc. primary role included the design and purchase of the electrical and controls systems, the creation of a process narrative, programming the control system, plant checkout, start-up and operator training. Dahlen Systems, Inc. also provided overall construction management for the project. The construction management included doing a feasibility study, preparing documents in order for the customer to obtain funding, machinery procurement, etc. The plant needed the ability to vary the speed of the bottling line based on the filler speed. Each piece of equipment controlled by our system had an automatic mode and a manual mode for maintenance and testing. All of the systems function in full automatic with minimal operator intervention. Project Costs
Project Total: $4.4MM Controls
|
|
Home Page | Contact Us | Experience | Clients Served | Employees | Affiliations |